NEWS

Service creates value,profession wins trust

Shelf installation skills


Release time:

2022/09/12

Shelf installation skills

1. Install the column

The complete column shall contain three parts of the column, the base and the front baffle hanger, which are welded together. Before installation, please confirm whether there is any missing parts and whether there is any knock on the surface. After the inspection, install the adjusting foot.

According to the height of the ground, adjust the height of the foot, and put the installed column on the ground. Install other columns as above.

2. Install the midplane

When installing the backplane, insert the mounting pins on the backplane into the long holes on the column, and install other backplanes in the same way.

3. Install the front baffle

Install the lowest layer of laminate.

4. Bracket installation

According to the height required for placing the goods, insert the hanging foot of the column into the long hole of the column. The brackets on the other side and the other layers shall be installed as above.

5, layer board

6. Precautions

Ensure that the installation floor level, ensure that all parts for the same shelf manufacturers matching products.

 

keywords